Melbourne · Kitchen prices

How much does a kitchen renovation cost in Melbourne?

A complete kitchen renovation with MelReno costs from $24,999, all inclusive and GST in — new cabinetry for 6–8 linear metres, benchtop, splashback, plumbing and electrical, and installation of the appliances you buy. A facelift that keeps the layout starts at $10,999; a fully custom kitchen at $34,999.

MelReno’s own prices, all including GST. Prices checked October 2026.

Kitchen prices at a glance

JobAll-inclusive price (GST in)Time
Kitchen facelift
New doors, handles, benchtop and splashback; layout kept
From $10,9991–2 weeks
Complete kitchen
All new cabinetry (6–8 linear metres), benchtop, splashback, plumbing & electrical
From $24,9995–7 weeks incl. joinery
Custom kitchen
Fully custom joinery, stone island with waterfall ends, butler’s pantry
From $34,9998–10 weeks
Where the money goes in a complete kitchen
ItemShare of budgetNotes
Cabinetry≈ 38%Biggest cost and the longest lead time
Benchtop≈ 12%Laminate from $840, stone from $2,100
Plumbing & electrical≈ 9%More if the sink or cooktop moves
Flooring & splashback≈ 9%A tiled splashback is the value pick
Demolition, painting, sundries≈ 6%Included in every quote
AppliancesNot includedYou buy them; we install them at no extra charge

What moves the price

  • Benchtop. Laminate from $840, stone from $2,100.
  • Cabinetry. Quality flat-pack or custom joinery — the biggest single line, about 38% of the budget.
  • Moving the sink or cooktop adds plumbing and electrical work.
  • Removing a wall. A load-bearing wall needs an engineer’s beam design and a building permit, quoted separately.

Appliances are not in the price — on purpose

You buy the appliances, so you pick the brands and catch the sales. We install them as part of the job at no extra charge.

Timing

Cabinetry takes 6–8 weeks to manufacture once the layout is signed off, which is why a complete kitchen runs 5–7 weeks and a custom one 8–10. The sooner the layout is decided, the sooner we start.

Book a free site inspection Find your suburb

Questions people ask

How much does a kitchen renovation cost in Melbourne?

With MelReno a complete kitchen costs from $24,999 including GST: all new cabinetry for 6–8 linear metres, a laminate, porcelain or stone benchtop, splashback, plumbing and electrical, and installation of the appliances you supply.

How much is a kitchen facelift?

From $10,999 including GST for new doors, handles, benchtop and splashback with the existing layout kept. It takes 1–2 weeks.

Are appliances included in the kitchen price?

No. You buy the appliances and choose the brands; we install them as part of the job at no extra charge.

How much does a stone benchtop add?

Benchtops start from $840 in laminate and from $2,100 in stone. The benchtop is typically about 12% of a complete kitchen budget.

How long does a kitchen renovation take?

A facelift takes 1–2 weeks, a complete kitchen 5–7 weeks and a custom kitchen 8–10 weeks. Cabinetry manufacturing (6–8 weeks after sign-off) is the bottleneck, not the build.

More on prices

Free, no obligation

Thinking about the existing house?

Free site inspection, one itemised written price, and an honest answer about what your budget will and won't stretch to. Complete bathrooms from $19,999 all inclusive.

Please enter your name
Please enter a valid phone number
Please enter a valid email
Please enter your suburb
Please choose a project type

We use these details only to contact you about this enquiry. The form is delivered by Formspree, which stores submissions in the United States — see our privacy policy, or email us directly if you would rather not use it.

Or call 0422 704 537 — Mon–Sat, 7am–6pm.

Thanks — we've got it.

We'll call you back to arrange a time, usually the same day.